This page contains press release content distributed by XPR Media. Members of the editorial and news staff of the USA TODAY Network were not involved in the creation of this content.

U.S. Data Center Construction Market to Reach USD 154.49 Billion Investment by 2031, Growing at 10.70% CAGR | Arizton

Expansion Led by Apple, Aligned Data Centers, AWS, CyrusOne, DataBank, and Digital Realty

Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.”
— Ryan Turner

CHICAGO, IL, UNITED STATES, February 25, 2026 /EINPresswire.com/ — The U.S. data center construction market is entering a high-growth phase, driven by rapid expansion in artificial intelligence, cloud computing, and data-intensive digital services. Investment valued at USD 83.97 billion in 2025 and projected to reach USD 154.49 billion by 2031, the market is being reshaped by rising demand for high-density computing, advanced storage systems, and power-intensive infrastructure. As enterprises accelerate migration toward public and hybrid cloud platforms, developers are expanding capacity to support low-latency, high-performance workloads and evolving regulatory requirements. At the same time, elevated construction costs and power constraints are intensifying competition for cost-efficient, energy-secure locations, making strategic site selection a critical factor in long-term market growth.

Report Snapshot:
MARKET SIZE BY INVESTMENT (2031): USD 154.49 Billion
MARKET SIZE BY INVESTMENT (2025): USD 83.97 Billion
CAGR BY INVESTMENT (2025-2031): 10.70%
MARKET SIZE – AREA (2031): 52.57 Million Sq. Ft.
POWER CAPACITY (2031): 13,565 MW
HISTORIC YEAR: 2022-2024
BASE YEAR: 2025
FORECAST YEAR: 2026-2031
MARKET SEGMENTATION: Facility Type, Infrastructure, Electrical Infrastructure, Mechanical Infrastructure, Cooling Systems, Cooling Technique, General Construction, Tier Standards, and Geography

AI Is Reengineering the Future of Data Center Infrastructure
AI is transforming the landscape of the global data center market, as rising adoption across industries continues to drive the expansion of hyperscale facilities and high-density infrastructure. While current AI investments have not yet fully offset overall hyperscale growth, the capacity of data centers dedicated to AI workloads is expected to nearly triple over the next five to six years. As a result, new facilities are increasingly being designed to support high-performance, AI-optimized environments that can handle complex and compute-intensive applications. This shift toward AI-focused infrastructure is directly accelerating the adoption of GPUs across data centers worldwide. To meet the growing demand for faster model training, real-time inference, and improved energy efficiency, operators are deploying GPU-powered systems capable of massively parallel computing. These technologies are enabling scalable, high-density facilities that can support next-generation AI workloads while maintaining operational efficiency.

Advanced Cooling Is Emerging as a Critical Enabler of AI-Ready Data Centers
Advanced cooling solutions are becoming essential for modern data centers as AI, ML, and IoT workloads continue to drive higher power density and heat generation. To maintain performance, reliability, and energy efficiency, operators are increasingly adopting liquid cooling, hybrid thermal systems, and sustainable cooling technologies that support high-density, AI-ready infrastructure while reducing power and water consumption. This shift is being accelerated through partnerships between data center operators, cooling technology providers, and energy innovators. A key example is the USD 1.9 billion agreement between Switch and Schneider Electric in November 2025, highlighting how advanced cooling and collaborative innovation are becoming central to building scalable, efficient, and future-ready data center facilities.

Power Systems are Becoming the New Competitive Edge in U.S. Data Centers
The rapid expansion of high-density AI and cloud workloads in the U.S. is driving a fundamental shift in data center power infrastructure. As rack densities exceed 20 kW to 30 kW, operators are increasingly adopting advanced UPS systems, lithium-ion batteries, energy storage solutions, and low-emission generator technologies to maintain reliability and energy efficiency. Modern battery and power systems are evolving into strategic assets, enabling lower operating costs, faster commissioning, and improved grid interaction. Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.
Reflecting this transition, Google has deployed more than 100 million lithium-ion cells across its global data center portfolio, leveraging a 48V DC rack-level power architecture with integrated Battery Backup Units (BBUs) to ensure uninterrupted, high-performance operations. Together, these developments highlight how advanced power infrastructure is now central to scalability, resilience, and long-term competitiveness in the U.S. data center construction market.

Access complete data tables and in-depth insights of market

The U.S. Data Center Construction Market Research Report Includes Size, Share, and Growth in Terms of
• Facility Type: Hyperscale Data Centers, Colocation Data Centers, and Enterprise Data Centers
• Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
• Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
• Mechanical Infrastructure: Cooling Systems, Racks, and Other Mechanical Infrastructure
• Cooling System: CRAC & CRAH Units, Chillers Units, Cooling Towers, Condensers, and Dry Coolers, and Other Cooling Units
• Cooling Techniques: Air-based Cooling and Liquid-based Cooling
• General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression, Physical Security, and DCIM/BMS Solutions
• Tier Standards: Tier I & Tier II, Tier III, and Tier IV
• Regions: Southeastern U.S., Midwestern U.S., Southwestern U.S., Western U.S., and Northeastern U.S.

Key Data Center Support Infrastructure Providers
• ABB
• Caterpillar
• Cummins
• Delta Electronics
• Eaton
• Legrand
• Rolls-Royce
• Schneider Electric
• STULZ
• Vertiv
Other Data Center Support Infrastructure Providers
• Airedale
• Alfa Laval
• Asetek
• Bloom Energy
• Carrier
• Condair
• Cormant
• Cyber Power Systems
• Enlogic
• FNT Software
• Generac Power Systems
• Green Revolution Cooling (GRC)
• HIMOINSA (Yanmar)
• HITEC Power Protection
• Johnson Controls
• KOHLER (Rehlko)
• KyotoCooling
• Mitsubishi Electric
• Natron Energy
• NetZoom
• Nlyte Software
• Rittal
• Siemens
• Trane
• ZincFive
Key Data Center Construction Contractors
• AECOM
• Ames Construction
• Arup
• Barge Design Solutions
• Burns & McDonnell
• Corgan
• DPR Construction
• Fortis Construction
• Haydon
• Holder Construction
• Jacobs
• KDC
• Kiewit Corporation
• Lewis Michael Consultants
• Morgan Construction
• Morgan Corp
• Page
• Rogers-O’Brien Construction
• Rosendin Electric
• Syska Hennessy Group
• Turner Construction
Other Data Center Construction Contractors
• AlfaTech
• Aplena
• Black & Veatch
• BlueScope Construction
• Brasfield & Gorrie
• CallisonRTKL
• Clark Construction Group
• Clayco
• Climatec
• Clune Construction
• EMCOR Group
• EYP MCF
• Fitzpatrick Architects
• Fluor Corporation
• Gensler
• Gilbane Building Company
• Gray
• HDR
• Hensel Phelps
• HITT Contracting
• Hoffman Construction
• JE Dunn Construction
• JHET Architects,
• JTM Construction Group
• kW Engineering
• Linesight
• M+W Group (Exyte)
• McCarthy Building Companies
• Morrison Hershfield
• Mortenson
• Pepper Construction
• Rosendin
• Ryan Companies
• Salute Mission Critical
• Sheehan Nagle Hartray Architects
• Skanska
• Southland Industries
• STO Building Group
• Sturgeon Electric Company
• Suffolk Construction
• Sundt Construction
• The Mulhern Group
• The Walsh Group
• The Weitz Company
• The Whiting-Turner Contracting Co.
• TRINITY Group Construction
• Walbridge
• WSP
Key Data Center Investors
• Apple
• Applied Digital
• AWS
• CyrusOne
• DataBank
• Digital Realty
• Equinix
• Google
• Meta
• Microsoft
• NTT DATA
• Vantage Data Centers
Other Data Center Investors
• AAIM Data Centers
• Aligned Data Centers
• American Tower
• Aubix
• Centersquare
• CloudHQ
• Cologix
• Compass Datacenters
• COPT Data Center Solutions
• Core Scientific
• Centra
• Crusoe
• DartPoints
• DC BLOX
• DigiPowerX (DigiHost)
• EdgeConneX
• EdgeCore Digital Infrastructure
• Element Critical
• FifteenFortySeven Critical Systems Realty (1547)
• Flexential
• H5 Data Centers
• HostDime
• Hut 8
• Iron Mountain
• Netrality Data Centers
• Novva Data Centers
• PhoenixNAP
• PowerHouse Data Centers
• Prime Data Centers
• QTS Realty Trust
• Sabey Data Centers
• Skybox Datacenters
• STACK Infrastructure
• Stream Data Centers
• Switch
• T5 Data Centers
• TierPoint
• WhiteFiber
• Yondr
• 365 Data Centers
• 5C Data Centers
• New Entrants
• Ada Infrastructure
• Ardent Data Centers
• Beale infrastructure
• Big Sky Digital Infrastructure
• CleanArc Data Centers
• CloudBurst Data Centers,
• Colovore
• Crane Data Centers
• Edged Energy
• Fleet Data centers
• Lambda
• LightHouse Data Centers
• Metroblocks
• NE Edge
• Penzance
• Prometheus Hyperscale
• Quantum Loophole
• RadiusDC
• Related digital
• Rowan Digital Infrastructure
• Sailfish Investors
• Tract

Discover Connected Market Opportunities:
U.S. Data Center Colocation Market – Industry Outlook & Forecast 2025-2030
https://www.arizton.com/market-reports/us-data-center-colocation-market
Global Data Center Construction Market Landscape 2025-2030
https://www.arizton.com/market-reports/data-center-construction-market-investment-forecast

What Key Findings Will Our Research Analysis Reveal?
• How big is the U.S. data center construction market?
• What is the estimated market size in terms of area in the U.S. data center construction market by 2031?
• What is the growth rate of the U.S. data center construction market?
• What are the key trends in the U.S. data center construction market?
• How many MW of power capacity is expected to reach the U.S. data center construction market by 2031?

Why Arizton?
100% Customer Satisfaction
24×7 availability – we are always there when you need us
200+ Fortune 500 Companies trust Arizton’s report
80% of our reports are exclusive and first in the industry
100% more data and analysis
1500+ reports published till date

Post-Purchase Benefit
• 1hr of free analyst discussion
• 10% off on customization

About Us:
Founded in 2017, Arizton Advisory & Intelligence delivers data-driven market research and strategic consulting that empowers clients to make informed decisions and drive growth. Combining quantitative and qualitative insights, we provide in-depth analysis across industries including Agriculture, Consumer Goods, Technology, Automotive, Healthcare, Data Centers, and Logistics. Recognized by top-tier media, our expert team transforms complex market data into actionable strategies, helping clients anticipate trends, seize opportunities, and stay ahead of the competition.

Jessica
Arizton Advisory & Intelligence
+1 312-680-2940
jessica@arizton.com
Visit us on social media:
LinkedIn
Facebook
X

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

La Mesa Dentist Compares Restorative Dentistry Procedures

La Mesa Dentist Compares Restorative Dentistry Procedures

Dr. Jimmy Wu, a San Diego-area dentist, details a range of restorative procedures, such as dental implants and

February 26, 2026

Ambs Call Center Launches EasyUpgrade to Help Mid-Size and Enterprise Teams Switch Answering Services With Less Risk

Ambs Call Center Launches EasyUpgrade to Help Mid-Size and Enterprise Teams Switch Answering Services With Less Risk

New offer targets businesses already paying for an answering service and considering a change, with an incentive for

February 26, 2026

Radisys and Rakuten Mobile Partner to Drive Digital Services with a Platform-Centric Approach

Radisys and Rakuten Mobile Partner to Drive Digital Services with a Platform-Centric Approach

DALLAS, TX, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Radisys® Corporation, a global leader of open

February 26, 2026

Vehicle Value Analysis Gives Collision Repair Shops a Powerful New Way to Protect Customers from Under-Indemnification

Vehicle Value Analysis Gives Collision Repair Shops a Powerful New Way to Protect Customers from Under-Indemnification

New Reporting Tools Provide Documentation to Challenge Low ACV Offers, Total Loss Valuations and Diminished Value Gaps

February 26, 2026

Elevated Dynamics Inc. Achieves 500 Quarterly Sales Milestone Six Months After Launching Verizon Collaboration

Elevated Dynamics Inc. Achieves 500 Quarterly Sales Milestone Six Months After Launching Verizon Collaboration

Elevated Dynamics reaches 500 sales for Verizon in one quarter, highlighting growth driven by wireless service

February 26, 2026

K.I.D.S. Executive Group Celebrates Management Promotions for Cancino and Gosselin

K.I.D.S. Executive Group Celebrates Management Promotions for Cancino and Gosselin

K.I.D.S. Executive Group promotes Stephen Cancino and Michael Gosselin to management, expanding operations in Kentucky

February 26, 2026

RadSite Webinar on Impact of Virtual Supervision & Remote Scanning on Administration of IV Contrast in CT & MRI Imaging

RadSite Webinar on Impact of Virtual Supervision & Remote Scanning on Administration of IV Contrast in CT & MRI Imaging

RadSite's Complimentary Educational Session Scheduled for March 11 This webinar will clarify who may administer

February 26, 2026

UAGC Connects Students and Alumni with Nearly 100,000 Employers Through Virtual Career Fair and Handshake Network

UAGC Connects Students and Alumni with Nearly 100,000 Employers Through Virtual Career Fair and Handshake Network

Our focus is creating direct pathways between our students and employers who recognize the value of their experience

February 26, 2026

Stagwell (STGW) Announces March Investor Conference Schedule

Stagwell (STGW) Announces March Investor Conference Schedule

NEW YORK CITY, NEW YORK / ACCESS Newswire / February 26, 2026 / Stagwell Inc. (NASDAQ:STGW), the global challenger

February 26, 2026

Cactus Unveils Three Unique Millionaire for Life Campaigns for Colorado Lottery, North Carolina Education Lottery and the Hoosier Lottery

Cactus Unveils Three Unique Millionaire for Life Campaigns for Colorado Lottery, North Carolina Education Lottery and the Hoosier Lottery

Cactus Demonstrates Strategy, Creative and Media Prowess by Developing and LaunchingThree Distinctive Campaigns for the

February 26, 2026

Telestream Advances Production-Ready AI Across Its Product Portfolio

Telestream Advances Production-Ready AI Across Its Product Portfolio

New AI capabilities drive smarter automation, enriched metadata, and assisted workflow design for live and file-based

February 26, 2026

Cubic Vocality to Exhibit Voice Interoperability Solutions at the International Wireless Communications Expo (IWCE)

Cubic Vocality to Exhibit Voice Interoperability Solutions at the International Wireless Communications Expo (IWCE)

Enabling real-time, cross-agency communication with advanced Radio over Internet Protocol (RoIP) and Push-to-Talk over

February 26, 2026

Press Advantage Addresses Why Client Skepticism Is Increasing in Professional Services Markets

Press Advantage Addresses Why Client Skepticism Is Increasing in Professional Services Markets

Las Vegas, NV – February 26, 2026 – PRESSADVANTAGE – Press Advantage, a leading press release distribution service, has

February 26, 2026

Radix IoT Announces Recipients of Dailenis González Frómeta Memorial Scholarship

Radix IoT Announces Recipients of Dailenis González Frómeta Memorial Scholarship

$30,000 in Scholarships Awarded to 14 NJIT and ULACIT Students DALLAS, TX, UNITED STATES, February 26, 2026

February 26, 2026

Clarity Liao Shines on Intimate, Piano-Driven Ballad ‘Like I Do’

Clarity Liao Shines on Intimate, Piano-Driven Ballad ‘Like I Do’

SAN FRANCISCO, CA, UNITED STATES, February 26, 2026 /EINPresswire.com/ — San Francisco-based singer-songwriter Clarity

February 26, 2026

Primech Holdings Limited Announces Receipt of Nasdaq Notification Letter Regarding Minimum Bid Price Deficiency

Primech Holdings Limited Announces Receipt of Nasdaq Notification Letter Regarding Minimum Bid Price Deficiency

Primech Holdings Ltd (NASDAQ:PMEC)SINGAPORE, SINGAPORE, February 26, 2026 /EINPresswire.com/ — Primech Holdings

February 26, 2026

Rogue Valley Microdevices Completes Pivotal Deal with Bridge Tronic to Acquire Advanced Manufacturing Technology

Rogue Valley Microdevices Completes Pivotal Deal with Bridge Tronic to Acquire Advanced Manufacturing Technology

As we build out our fab, we’re taking a major step toward enabling the next generation of innovation in the U.S.”—

February 26, 2026

International Towing and Recovery Hall of Fame and Museum Celebrates 40th Anniversary of Its First Hall of Fame Class

International Towing and Recovery Hall of Fame and Museum Celebrates 40th Anniversary of Its First Hall of Fame Class

The International Towing Museum in Chattanooga, TN, celebrates 40 years of honoring towing industry leaders worldwide

February 26, 2026

RML unleashes GT Hypercar in America with Sunshine State debut

RML unleashes GT Hypercar in America with Sunshine State debut

We’ve fine-tuned every element, from performance through to aesthetics, to set new standards in performance, refinement

February 26, 2026

Permutive Appoints Ad Industry Innovator Dave Rosner as CMO

Permutive Appoints Ad Industry Innovator Dave Rosner as CMO

Publisher technology leader welcomes one of programmatic’s pioneering voices amid expansion into curation and agentic

February 26, 2026

Cleanwatts Digital and Shortcut in partnership to extend energy management modernization to critical sectors in Portugal

Cleanwatts Digital and Shortcut in partnership to extend energy management modernization to critical sectors in Portugal

Alliance aims to reach different sectors of activity and offer integrated solution to the public sector and the

February 26, 2026

Nijigen no Mori ‘NARUTO&BORUTO Shinobi-Zato’ ‘Shinobi-Zato 7th Anniversary Event’ Announced

Nijigen no Mori ‘NARUTO&BORUTO Shinobi-Zato’ ‘Shinobi-Zato 7th Anniversary Event’ Announced

Vol. 2: "Uzumaki Boruto Birthday 2026" Coming Soon AWAJI, JAPAN, February 26, 2026 /EINPresswire.com/ —

February 26, 2026

MELANIE MARTINEZ CLAIMS HER CROWN WITH TODAY’S RELEASE OF NEW TRACK ‘DISNEY PRINCESS’

MELANIE MARTINEZ CLAIMS HER CROWN WITH TODAY’S RELEASE OF NEW TRACK ‘DISNEY PRINCESS’

multi-platinum, multi-hyphenate force, Melanie Martinez, continues paving the road to her forthcoming album with

February 26, 2026

Mother Goose Health Joins 2026 HealthTech 250: A Global List of the Most Promising Early-Stage Digital Health Startups

Mother Goose Health Joins 2026 HealthTech 250: A Global List of the Most Promising Early-Stage Digital Health Startups

Recognized among 75 U.S. companies on Galen Growth’s global HealthTech 250 list, selected from a scan of 55,000+

February 26, 2026

Smarter Merch Starts Here: Smart Blanks Introduces New Tour-Ready Fleece

Smarter Merch Starts Here: Smart Blanks Introduces New Tour-Ready Fleece

Three premium fleece hoodies feature mineral wash, pigment dye, and spray effects for distinctive character and texture

February 26, 2026

One in Three Organizations Experienced a Data Sovereignty Incident Last Year—Despite Record-High Awareness

One in Three Organizations Experienced a Data Sovereignty Incident Last Year—Despite Record-High Awareness

44% say they're experts. One in three had a sovereignty incident anyway. The gap between knowing and proving is where

February 26, 2026

CIRCA Launches The CIRCA Vault: An Exclusive Shoppable Experience

CIRCA Launches The CIRCA Vault: An Exclusive Shoppable Experience

A Weekly Curated Collection Of Luxury, Pre-Owned Jewelry Available Through A Limited-Time Online Buying Experience The

February 26, 2026

AMUG Announces Second Keynote Presentation for 2026 Conference

AMUG Announces Second Keynote Presentation for 2026 Conference

General Atomics and Divergent to discuss cross-industry collaboration in a keynote address. I am very excited to hear

February 26, 2026

Climate Solutions Launches New Website and Expands Service Division to Support Texas Growth

Climate Solutions Launches New Website and Expands Service Division to Support Texas Growth

The digital relaunch reflects integration into the Modigent family of companies By aligning under Modigent, we’re able

February 26, 2026

Simetric and Skylo ​Partner ​​​​​to Deliver Enterprise Control Plane for Global NTN IoT Connectivity

Simetric and Skylo ​Partner ​​​​​to Deliver Enterprise Control Plane for Global NTN IoT Connectivity

Skylo partners with Simetric, positioning their single pane of glass platform for customers and for centralized control

February 26, 2026

American Beekeeping Federation Names 2026 Officers

American Beekeeping Federation Names 2026 Officers

President: Debbie Seib, Seib’s Hoosier Honey; Vice President: Richard Coy, Coy’s Honey Farm ATLANTA, GA, UNITED STATES,

February 26, 2026

G.O.L.T.® STAR Certification for GRC Platform

G.O.L.T.® STAR Certification for GRC Platform

konaAI, a Covasant company, certified by TRANSFORMING.LEGAL as G.O.L.T.® STAR It is a jungle out there. With fierce

February 26, 2026

MetaShape Pharma Appoints World-Leading Bioenergetics Expert, Professor Shingo Kajimura, as Scientific Advisor

MetaShape Pharma Appoints World-Leading Bioenergetics Expert, Professor Shingo Kajimura, as Scientific Advisor

Physician-scientist and acclaimed adipose tissue biologist to advise on first-in-class, oral MS 001 for obesity.

February 26, 2026

The QWL Method – Transforming Employee Experience into Measurable Performance

The QWL Method – Transforming Employee Experience into Measurable Performance

The QWL (Quality of Working Life) Index is the only scientifically validated method that converts employee experience

February 26, 2026

Serial Cables Launches PCIe Gen6 / CXL 3.1 x16 MCIO Retimer Card

Serial Cables Launches PCIe Gen6 / CXL 3.1 x16 MCIO Retimer Card

Serial Cables PCIe/CXL Gen6 x16 MCIO Retimer Card recovers and extends high-speed signals at 64 GT/s PAM4 with Marvell

February 26, 2026

West Virginia SpaceTrek 2.0: Space Systems Summer Program for Young Women Expands to West Virginia Wesleyan College

West Virginia SpaceTrek 2.0: Space Systems Summer Program for Young Women Expands to West Virginia Wesleyan College

Successful Space Systems Summer Program for Young Women Expands to West Virginia Wesleyan College for 2026 West

February 26, 2026

Execs Collect Show Announces, ‘Sky & Space Series‘ Featuring Frontiers of Flight Museum, Aerospace & Star Wars History

Execs Collect Show Announces, ‘Sky & Space Series‘ Featuring Frontiers of Flight Museum, Aerospace & Star Wars History

Execs Collect highlights collectibles, technology, history and aerospace career opportunities Our guests and sponsors

February 26, 2026

Tom Jackobs Advises Health Practices to Prioritize Follow-Up Systems Over Lead Volume Ahead of Fall Scheduling

Tom Jackobs Advises Health Practices to Prioritize Follow-Up Systems Over Lead Volume Ahead of Fall Scheduling

Fractional sales management and automation designed to turn existing leads into booked consultations Your practice can

February 26, 2026

Animated Educational Pilot to Launch This August, Expanding Beloved Book and App Series for Families

Animated Educational Pilot to Launch This August, Expanding Beloved Book and App Series for Families

New animated project reinforces literacy, emotional intelligence, and family-centered learning through storytelling

February 26, 2026

Almea plans to Establish an AI-Native Wealth Bank, Subject to Regulatory Approval— Pioneering Agent-Driven Finance Era

Almea plans to Establish an AI-Native Wealth Bank, Subject to Regulatory Approval— Pioneering Agent-Driven Finance Era

Co-founded by Jacek Starobrat and Szymon Piekarz, Almea is building core banking infrastructure from the ground up on

February 26, 2026